
Little
Charlottesville Fire Station No. 1
City of Charlottesville
Charlottesville, Virginia
Project Type
Civic & Cultural
Size
7,636 Square Feet
Design Services
Architecture

Fire Station No. 1 turns one of the city’s toughest sites into a healthy, high-performing home for the Charlottesville Fire Department.
The original 1961 two-bay station no longer met the needs of a modern fire department. Its replacement sits along the Route 250 Bypass, beside the old station, on a steep, wooded slope near streams and McIntire Park. It’s the kind of site many would call unbuildable.
Design Awards
- F.I.E.R.O. Design Awards, Honor Award
- Firehouse Station Design Award, Gold Award
Certifications
- LEED Gold
Project Goals
Charlottesville leaders wanted a station that would serve the city for decades. That meant stronger emergency response, more support for the firefighters who live and work there around the clock, and a LEED Silver sustainability target. The old station also had to stay in service while the new one went up next door.

Objectives
- Minimize impact on a sensitive park site
- Speed up rest to response
- Support firefighter wellness
- Leave room for growth

Solutions
Instead of fighting the hillside, the design team built over it. City staff, firefighters, Little, and Nielsen Builders worked side by side to shape a compact station where every square foot has a job, with public, operational, and support spaces each in their own zone. Firefighters helped guide the design from the start, so the layout reflects how crews actually work.
THE FLOATING FIREHOUSE
A creative answer to a difficult site
Raising the station on a structural slab and steel columns minimized excavation, avoided extensive retaining walls and earthwork, and preserved much of the surrounding woods. It also gave the station its signature look, a distinctive form that lifts above the hillside and responds directly to its setting.

CLEAN AND READY
A layout built around health and fast response
The apparatus bay is clearly separated from living quarters, with dedicated decontamination areas, a decon shower, and PPE storage that help keep diesel exhaust and carcinogens out of occupied spaces. A direct-capture exhaust system serves the apparatus bay. Short, direct routes connect bunk rooms, gear storage, and apparatus, so crews move quickly from rest to response. The plan also leaves room for an additional bay to the west and more bunk rooms to the east.

A STATION IN THE PARK
Daylight, views, and a direct link to trails
The open kitchen, dining area, and day room fill with daylight and look out over the woods. The fitness room sits beside direct access to the McIntire Park trail network, giving crews an easy place to run and park visitors a chance to connect with their firefighters. Single-person bunk rooms with two beds allow for surge staffing, and low-emitting materials, acoustical treatments, and durable finishes support healthier air, quieter spaces, and the demands of 24-hour operations.


Results
Fire Station No. 1 earned LEED Gold, exceeding the City’s goal of Silver. It performs about 51% better than industry energy standards, and rooftop solar panels are expected to cover roughly 42% of its electricity. A natural stormwater system protects the site, and emergency power keeps the station running when the community needs it most.
Completed in March 2025, the project finished with zero lost-time injuries and no interruption to emergency service.








